← Todas las referencias

Preparation of Technical Specification for TAIB 2012 Supply Contract for supply of appropriate equipment to exchange and manage information and monitoring for water, waste, air management, nature and climate change

Duración:
2016 – 2017
Importe:
menos de 500.000 €
Países:
North Macedonia
Socios:
Particip (líder), ETI, Ramboll Deutschland
Palabras clave:
GCP / marco lógico, Medio ambiente, Tecnologías de la información
11-0226-091-MKD-techsupTAIB

The project objective was to further approximate and implement the environmental acquisition, through strengthening the administrative capacities for environmental management on central and local level in the fields of water management, waste management, nature protection, air management and climate change.

The specific objective of this assignment was to assist the Beneficiary institution – MoEPP with the preparation of Technical Specification for TAIB 2012 Supply Contract for appropriate equipment to exchange and manage information and monitoring for water, waste, air management, nature and climate change.