Preparation of Technical Specification for TAIB 2012 Supply Contract for supply of appropriate equipment to exchange and manage information and monitoring for water, waste, air management, nature and climate change
- Durée :
- 2016 – 2017
- Montant :
- moins de 500 000 €
- Pays :
- Macédoine du Nord
- Partenaires :
- Particip (chef de file), ETI, Ramboll Deutschland
- Mots-clés :
- Environnement, GCP / cadre logique, Technologies de l'information
The project objective was to further approximate and implement the environmental acquisition, through strengthening the administrative capacities for environmental management on central and local level in the fields of water management, waste management, nature protection, air management and climate change.
The specific objective of this assignment was to assist the Beneficiary institution – MoEPP with the preparation of Technical Specification for TAIB 2012 Supply Contract for appropriate equipment to exchange and manage information and monitoring for water, waste, air management, nature and climate change.